Minutes of the SB Meeting of February 2010

Session 1 - Thur 11 Feb 2010

Attending:
- CERN: John, Gunter,Vladimir, Gabriele (4)
- Japan:Hisaya,Koichi, (2)
- US: Joseph, Paul,Sunanda, Makoto, Dennis (5)
- Elsewhere: (3)
- Pablo Cirrone from INFN-LNS
- Peter Gumplinger TRIUMF
- Marc Verderi, LLR/Ecole polytechnique
Excuses: Takashi S., Sebastien I., Giacomo C.

1. Regular Issues

a) Approval of minutes of SB meeting of 11th December 2009
   Minutes approved with one correction.
   - Proposal agreed to make appendices separate document, available to the collaboration, if feasible.

2. Conference and workshop participation

Recommendations of Abstract Assessment and Editorial team (AEE team) approved. Agreed to signify approved submissions by adding the text
"On behalf of Geant4 collaboration" for the contribution on behalf of the full collaboration (abstract 10), and
"on behalf of the (specific) Geant4 Working Group(s)" for all other approved abstracts.
 SB members asked to make final check approved abstracts and give final feedback.

Agreed to keep process used for MC2010, unchanged, for SATIF meeting (deadline 28 Feb).

Form for submitting request will be circulated to the collaboration. The initiative for making conference submissions can originate from individuals, working groups or the steering board. All proposed contributions must be submitted for vetting by the Abstract Assessment and Editorial team and, in case issues are raised, the approval of the Steering Board should be sought.

Agreed on revised process for conferences with deadlines in March (Cospar, SATIF): after submission via the form, approval will be given by the AAE team, on behalf of the SB for those cases that the AAE team is able to reach a conclusion.

John agreed to maintain list of conferences - temporarily for the AAE team. Please inform John for additional conferences in which Geant4 can have interest, to update the form. Agreed to proceed to refresh membership of 3-member editorial team by March 30th, with mandate until end 2010.

3. Processes for Collaboration Matters

4. - Working Group (and Task) Proposed Work Items

Performance Task: 
John informed of the new leader for Performance Task: Daniel Elvira (Fermilab). SB agreed with the appointment.

Agreed that hotspots and similar code performance issues should be informed to the relevant WG for improvement.

Remaining to be covered in next part of meeting.

AOB

- SLAC group announces a Geant4 Tutorial at University of Puebla, Mexico planned for June 14th/18th.

Second part of SB Meeting - Thur 25 Feb 2010

Present:
CERN: John Ap, Gabriele, Gunter, Vladimir Iv., Dennis, Makoto,
US: Joseph, Paul
Japan: Katsuya, Koichi, Hisaya,
France: Michel
Italy: Pablo C.
Excuses: Takashi, Sebastien, Marc

3. Processes for Collaboration Matters (continued)

Census
- Results of census reported to Steering Board. Include corrections for new collaborators.

Working Group FTEs (%)

Number of SB Repr.

Run/Event 113 1
Tracking 15 1
Particle 23 1
Geometry 100 1
Processes/Materials 35 1
EM Std 555 3
EM Low En. 882 4
Hadronic Ph. 838 4
Persistency 45 1
User Interfaces 115 1
Visualisation 150 1
Testing 87 1
Software Management 100 1
Advanced Ex. 285 1
Docum. Mng. 100 1
Collaboration Mat. 70 -
     
Total 3513  


- Working Groups asked to elect the number of SB Representatives indicated. Results of Elections of Working Group Representatives requested by March 20th.
- Next SB meeting will be transitional, with existing SB members for the first short part, and the new membership during the second part.

Geant4 Workshop
- Workshop date Oct 4th-8th (at ESTEC) agreed.
- John to create poll to estimate attendance ( threshold of 40 for room - if >40 different room will be reseved)
- Program Committee for Workshop
   * Start organisation (find person to start organising)

4. Working Group (and Task) Proposed Work Items (cont.)

Tasks

 Related topics: Advanced Examples: Clarified the mandate to create and maintain 'demonstration' applications, simplified versions of users' applications - for inclusion in distribution. ( Full, complex versions of such applications can be undertaken and released separately. ) Agreed to explore use of Twiki for clarify relationship between the examples provided and other applications in the same area (e.g. Gamos, ptssim, .. ).

Collaboration Milestones

Static Code Review Agreed to understand Static Code Review using the Coverity tool/service as Collaboration Activity and Milestone 2010. SB asks CERN team to undertake a first review of G4 code, and report results (as a QA activity).

Architecture Review Architecture team reported on discussions, organisation of topics, and issues identified for further study. Request for feedback on first report by March 8th. Dates for proposed mini-workshop are June 28th-July 2nd at LAPP. Request and poll for attendance will be circulate shortly. Architecture Team will meet during week of March 22nd, making arrangements for discussions on topics with coordinators of particular categories as needed.

AOB